Send Message
Home ProductsRubber Batch Off Machine

OEM Design Rubber Sheet Cooling Equipment 2 Years Warranty

China Qingdao Shun Cheong Rubber machinery Manufacturing Co., Ltd. certification
China Qingdao Shun Cheong Rubber machinery Manufacturing Co., Ltd. certification
Qingdao Shun Cheong Rubber Machinery ,their machine is very good.

—— Plastik

I'm Online Chat Now

OEM Design Rubber Sheet Cooling Equipment 2 Years Warranty

OEM Design Rubber Sheet Cooling Equipment 2 Years Warranty
OEM Design Rubber Sheet Cooling Equipment 2 Years Warranty OEM Design Rubber Sheet Cooling Equipment 2 Years Warranty OEM Design Rubber Sheet Cooling Equipment 2 Years Warranty OEM Design Rubber Sheet Cooling Equipment 2 Years Warranty

Large Image :  OEM Design Rubber Sheet Cooling Equipment 2 Years Warranty

Product Details:
Place of Origin: China
Brand Name: SFC
Certification: CE, SGS, ISO
Model Number: XPG Series
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Container
Delivery Time: 15 working day
Payment Terms: L/C, T/T
Supply Ability: 20 sets per month
Detailed Product Description
Name: Batch Off Cooler Max, Perdant Length Of Hanging Sheet: 1400mm
Swing Sheet Frequency: 13 M/min Max.Rubber Sheet Width: 600-900 Mm
No.of Cooling Fans: 12-26 Specification: As Per Your Requirement
High Light:

OEM Rubber Sheet Cooling Equipment

,

SFC Rubber Cooling Equipment

Rubber Sheet Cooler / Rubber Sheet Cooling Device / Slab Cooling Unit for Cooling Rubber Sheet

 

 

 

1.Usage:

 

The Rubber batch-off machine is used for cooling, folding and depositing the rubber strip that comes from the open mills or twin screw extruder.


2.Features:


1. There are two structure types: overhead and floor-standing types, whose hanging racks are vertically turning with compulsive cooling.
2. The rubber strip hanging bar adopts step by step cylinder or motor-reducer for driving.


3. Structure:


1) The batch-off unit consists of mainframe and electrical control system.


2) The mainframe is composed of splicer, printing, slitter, isolation cooling, lifting device, hanging strip cooling, auto wig wag section, weighing, handrail, platform and supporting bracket etc.


3) The electrical control system consists of main control cabinets, and there are emergency stop device in key areas.


4.Advantages:
1. The clients can choose high or low disposition according to the practical requirements.


2. The high dispostition batch-off line has hydraulic auto wig wag section, which can battle the rubber strip tidily, the strip tidy ratio≤100mm


3. There are three working positions for auto entering and outputting of material tray; auto rubber collecting device, auto cutter, it has high automatization and can realize nobody operating.


5.Our Services:


1. 2 years warranty.


2. Engineers available to service machinery overseas.


3. If there is problem, we will give feedback within 24hours.


6.about batch-off unit Price:


The price bases on the following factors:


1. Structure: overhead or floor-standing


2. Length: the suitable length for the cusomer's plant


3. Fan's quantity: the suitable quantity of fans which is needed


4. Automatic device: suitable selection of automatic device

 

 

Parameter:

 

Model XPG-600~700 XPG-800~1000
Applicable Rubber Sheet Size (4-12)X600~700 (4-12)X800~1000
Max.line speed of front access conveyor belt 31m/min 36m/min
Max.line speed of hanging rod 0.7-4.2m/min 0.6-4.2m/min
Axial fan 0.37kw 5760m3/m 0.37kw 5760m3/m
Swing rubber range and frequency 1.2m 10-16times/min 1.2m 10-16times/min
Rubber sheet temperature after cooling ≤Greenhouse +5℃ ≤Greenhouse +5℃
Speed adjustment control method Inverter control Inverter control
Hanging Rod space 160 or 101.6 160 or 101.6

OEM Design Rubber Sheet Cooling Equipment 2 Years Warranty 0

 

 

 

OEM Design Rubber Sheet Cooling Equipment 2 Years Warranty 1

FAQ

1. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production. Every machine will be fully assembled and carefully tested before shipment.

2. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.

3. Are you able to give installation and commissioning overseas?How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation. Small machine usually takes within 2~3 days. Big production line usually takes about 30 days.

4. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order. The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers.
If you come to our factory, we can show the user around us.

5. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport. We will pick up you at the airport.

Our Services

♦ Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
♦ In the process of production, we will take photos and send to customers for their track the progress.
♦ Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
♦ We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
♦ We supply overseas engineer service and help to train your workers to operate the machine.

 

Contact Details
Qingdao Shun Cheong Rubber machinery Manufacturing Co., Ltd.

Contact Person: Mr. Jake Chen

Tel: +8613963975727

Fax: 86-532-8518-5697

Send your inquiry directly to us (0 / 3000)